Built by a Medical Specialist who trains
Training log, sparring journal, belt tracker and a daily readiness score for BJJ, MMA, Muay Thai and every art you train.
Start free with 30 days of PRO. Every new account gets 30 days of PRO. No card needed.
Run a school? It's free for your whole school →
Or start with your art

For school owners and coaches
Combat FIT doesn't try to run your school. Keep your booking and billing software. We give the people on your mat a training log, a sparring journal, belt tracking and recovery tools, so they see themselves getting better. Students who see progress keep coming back.
US$0 for your whole school
School owners can also earn 30% of what their students pay for PRO, every month they stay.
What you can track
Every session by discipline, type, duration and effort, with weekly volume and streaks.
Rounds, partners, what worked and what to drill next.
Your rank in every art you train, stripes, and a countdown to the next grading.
Six guided bodyweight sessions a week with illustrated, full-screen coaching. Never more than 20 minutes, and it logs itself.
A daily 0 to 100 score from your training load, morning check-in, injuries and nutrition.
A short plan for the day written from what you have logged.
What hurts and how it changes, weight trend and cut planner, macros.
A two-minute check without a wearable, or sync Fitbit (Google Health) and Polar.
Sync classes and gradings to Google, Apple or Outlook. PDF reports for your coach on PRO.
See every feature · What a martial arts training app should track
Free vs PRO
Start free with 30 days of PRO. Every new account gets 30 days of PRO. No card needed.
FREE
US$0
No time limit.
PRO
US$12.50 /month
Or US$31.13 a quarter, or US$112.50 a year. Cancel any time.
Run a school, club or gym?It's free for your whole school, and every student who joins gets 60 days of PRO free.
For schools →Sell gear, seminars or camps? List on the Combat FIT Marketplace for USD $1/item/day, no commission, and buyers go straight to your store. The first 25 verified businesses list free until 31 March 2027.

Built by a Medical Specialist
I hold a 1st Dan in Taekwondo and Shodan in Kendo and Iaido, and I'm currently a BJJ white belt. I built Combat FIT because my training notes, gradings and recovery checks were spread across too many apps. Every module is something I wanted in my own training.
About Dr Hall →Every discipline
Each art keeps its own belt or rank ladder and session types, so a BJJ roll and a Muay Thai pad round are not logged as the same thing.
Rolls, positions, submissions, stripes.
Striking and grappling logged separately, fight camp and weight cut.
Pad rounds, sparring rounds and conditioning.
Round volume, sparring and weight class.
Both grading systems, patterns and sparring.
Randori, technique work and grading.
Kata, kumite and grading across the major styles.
Live rounds, drilling and weight class.
Grades and practice logs.
Rucking, fitness tests and training load.
Common Questions
Combat FIT is a martial arts training app. You log sessions and sparring rounds, track belts and gradings in every art you train, and check a daily readiness score before you train. It runs in any modern browser on your phone or computer, so there is nothing to install.
Yes. The free plan has no time limit and includes the belt and grading tracker, sparring journal, martial arts profile, calendar sync and the marketplace. Every new account gets 30 days of PRO. No card needed. PRO costs US$12.50 a month, US$31.13 a quarter or US$112.50 a year.
BJJ (gi and no-gi), MMA, Muay Thai, Boxing, Taekwondo (WT and ITF), Judo, Karate, Wrestling, Kendo and Iaido, plus a military and tactical profile. Each art keeps its own belt or rank ladder, so you can hold a rank in one art and be a beginner in another.
A PRO feature: a daily score from 0 to 100 built from what you log, covering training load, your morning recovery check-in, nutrition, injuries, supplements and mental readiness. Use it as a prompt when you plan the day's session. It is not medical advice.
No. The morning check-in works without one. If you use Fitbit (Google Health) or Polar, you can connect it to sync workouts into your training log. WHOOP is coming soon.
Only if you choose. PRO can export a PDF progress report to send to a coach, and if you link to your school you decide whether its coaches can see your readiness score.
Yes, it is free for your whole school. Combat FIT isn't built to run your school: keep your booking and billing software. It gives your students a training log, sparring journal, belt tracking and recovery tools, and every student who joins your school gets 60 days of PRO free. You get member management, attendance, events, gradings and announcements, plus your own PRO account once 5 students join. The first 3 coaches are free, then US$5 a month per coach.
Dr Sean Hall, a Medical Specialist (MD, MBA, PhD) and martial artist: Taekwondo 1st Dan, Kendo Shodan, Iaido Shodan, and currently a BJJ white belt. He built Combat FIT to keep his own training in one place.
Still have questions? Email Dr Hall directly
Start free with 30 days of PRO. Every new account gets 30 days of PRO. No card needed.